Solutions for the power

behind electrification.

Three disciplines, one engineering team. Whether you are connecting a battery, reinforcing a network or powering a campus, the system is designed as a whole.

■ 01 · Battery energy storage systems

Energy Storage

Grid-scale and behind-the-meter battery systems from two to eight hours — sized to the connection, the market and the revenue case, and run by our energy management platform from day one.

Energy arbitrage

Frequency response

Renewable firming

■ 02 · Substations, connections & stability

Grid Infrastructure

Substations, grid connections and stability equipment that let networks take on more renewables, more demand and more storage — without compromising reliability.

Substations & switchgear

Grid connections

Reactive power & stability

■ 03 · Power for digital infrastructure

Data Center Power

Utility feeds, on-site storage, generation and UPS designed as one redundant power train — for facilities where a single second offline is measured in millions.

Utility interconnection

On-site storage

UPS & distribution

(02) At a glance

Which solution

fits your project?

Most projects combine more than one. Typical scopes below — every system is sized to its site.

Scope

Energy Storage

Grid Infrastructure

Data Center Power

Typical clients

Developers, utilities, IPPs

Network operators, generators

Hyperscale & colocation operators

Typical scale

20 – 500 MW

11 – 400 kV

10 – 300 MW critical load

Key equipment

Battery blocks, PCS, EMS

Switchgear, transformers, STATCOM

Substation, BESS, UPS, generators

Delivery time

12 – 18 months

12 – 30 months

Phased, 12 – 36 months

Revenue / value

Arbitrage, grid services, capacity

Connection capacity, reliability

Uptime, demand charges, speed to power

Ranges illustrative

(03) How we deliver

One team from

first study to year twenty.

01

Feasibility

Site, grid and revenue analysis

02

Design

System engineering and studies

03

Procurement

Vendor-neutral equipment selection

04

Construction

Build, test and commission

05

Operation

Twenty years of dispatch and care

Let’s build infrastructure

for what’s next.

Tell us about your site, your load or your grid connection. An engineer — not a sales team — will reply within two working days.

Let’s build infrastructure

for what’s next.

Tell us about your site, your load or your grid connection. An engineer — not a sales team — will reply within two working days.