ARQVOLTGrid 50.01 HzDiscuss a Project

/

/

Grid Infrastructure

■ 02 · Substations, connections & stability

A stronger grid,

one node at a time.

Substations, grid connections and stability equipment that let networks take on more renewables, more demand and more storage — without compromising reliability.

400 kV

Maximum voltage

IEC 61850

Digital substation standard

N-1

Security design

24/7

Remote monitoring

Figures illustrative

(01) Approach

Every new wind farm, battery and data center needs somewhere to connect. We design and build the nodes that make the network bigger, smarter and more resilient.

Infrastructure supporting grid reliability, integration and modernisation. Every system is designed, built and operated by the same accountable team.

(02) Applications

Where it

creates value.

01

Substations & switchgear

Air- and gas-insulated substations from 11 kV to 400 kV.

02

Grid connections

Connection design, studies and works for generators and large loads.

03

Reactive power & stability

STATCOMs, synchronous condensers and grid-forming storage.

04

Protection & control

Digital protection schemes, SCADA and substation automation.

05

Network reinforcement

Upgrades that release capacity on constrained networks.

(03) How it works

From first study

to everyday operation.

01

Study

Load-flow, short-circuit and stability studies define what the network needs.

02

Engineer

Primary and secondary design, earthing, protection and civil works.

03

Construct

Installation, testing and energisation, coordinated with the network operator.

04

Maintain

Condition monitoring and maintenance to keep assets available.

Offshore windSolarSubstation ASubstation BStorageCity loadIndustryNetwork schematic · Illustrative

(04) Technical information

Reference

specification.

Typical ranges for a reference system. Final specifications follow grid studies and site design.

Voltage range

11 kV – 400 kV

Insulation

AIS and GIS

Automation

IEC 61850 digital substations

Stability

STATCOM, synchronous condensers

Protection

Distance, differential, busbar

Studies

Load flow, short circuit, harmonics, RMS/EMT

Illustrative reference values

(06) Questions

Good to know.

Other solutions:

Yes. We coordinate design approvals, outages and energisation with the operator on the developer’s behalf.

Where the market allows it, we design and build connection assets for adoption by the network operator.

No — a large share of our work is upgrading and extending existing substations.

Let’s build infrastructure

for what’s next.

Tell us about your site, your load or your grid connection. An engineer — not a sales team — will reply within two working days.

Let’s build infrastructure

for what’s next.

Tell us about your site, your load or your grid connection. An engineer — not a sales team — will reply within two working days.

Let’s build infrastructure

for what’s next.

Tell us about your site, your load or your grid connection. An engineer — not a sales team — will reply within two working days.

Create a free website with Framer, the website builder loved by startups, designers and agencies.