■ Energy infrastructure

Storage · Grid · Data center power

Est. 2014 — London / Rotterdam / Austin

Demo site AV-07

Engineering the

next era of power.

Intelligent energy storage and power infrastructure engineered for a world that cannot afford to stand still.

24 h dispatch profile · IllustrativeDischarge to gridCharge from surplusNow 18:00 · Discharging
00:0006:0012:0018:0024:00
Site AV-07Illustrative
Mode
Discharging
Output
152.8 MW
Grid frequency
49.98 Hz
State of charge
86%

(02) Company

We design, build and operate the infrastructure that makes electricity flexible —

storage, conversion and control engineered as one system, for operators who can’t afford downtime.

From feasibility to twenty years of operation, our teams carry a project through every stage: grid studies, system design, procurement, construction, commissioning and the software that runs it all.

■ Delivery

Feasibility to operation

One contract, one team, one point of responsibility.

■ Delivery

Feasibility to operation

One contract, one team, one point of responsibility.

■ Independence

Vendor-neutral

Batteries and inverters selected for the site, not the catalogue.

■ Operations

24/7 control room

Remote monitoring and dispatch for every asset we build.

(03) Solutions

Built for the places where power

matters most.

01 — Energy Storage

Store it now.

Dispatch it

when it counts.

Battery systems from two to eight hours, sized to the grid connection and the revenue case. Built on modular blocks, run by our energy management platform.

Reference configurationIllustrative
Duration
Power / energy100 MW / 400 MWh
Battery blocks80 blocks
Footprint~2.8 ha
ChemistryLithium iron phosphate

02 — Grid Infrastructure

A stronger grid,

one node at a time.

Substations, grid connections and stability equipment that let networks take on more renewables, more demand and more storage — without compromising reliability.

Substations & switchgear

Up to 400 kV

Grid connection studies

Planning

Reactive power & stability

STATCOM

Protection & control

IEC 61850

Offshore windSolarSubstation ASubstation BStorageCity loadIndustryNetwork schematic · Illustrative

03 — Data Center Power

Power that doesn’t

blink.

Utility feeds, on-site storage, generation and UPS designed as one redundant power train — for facilities where a single second offline is measured in millions.

Redundant power trainIllustrative
Feed AUtility
Feed BUtility
StorageBESS
StandbyGenerators
Hall 1Hall 2Hall 3Hall 4CoolingSpare

(04) System architecture

How an energy system

connects.

Switch modes to follow the power. The same hardware charges from surplus, discharges into the peak and keeps critical load running when the grid fails.

Illustrative system · Single-line overview
Transmission networkGrid132 / 33 kVSubstationInverters · PCSPower conversionEMS · ControlsEnergy managementData center · IndustryDemand8 blocks · LFPBattery storageSoC 92%
Mode 01 / 03

Charge

When renewable output is high and prices are low, the site imports power through the substation and stores it in the battery blocks.

Grid · Substation · Power conversion · Storage · Energy management · DemandValues illustrative

■ Our approach

Power is no longer only generated. It is stored, shaped and dispatched — by the second.

That changes what infrastructure has to do. We build systems that think as fast as the grid moves.

(06) Performance & engineering

Engineered to be

uneventful.

The best infrastructure is the kind nobody notices. Five principles shape every system we design.

Every system is designed around the failure it must survive: redundant power paths, spare capacity and components chosen for a twenty-year life.

Batteries, conversion, protection and controls are engineered as one system, so responsibility never falls between suppliers.

Operators see every cell, inverter and breaker in real time, with alarms that explain what happened and what to do next.

Losses are designed out: from transformer selection to thermal management, every percentage point of round-trip efficiency is revenue.

Sites are planned for the next phase, not just the first. Blocks, bays and software scale without redesign.

(07) Technology

One platform

runs every asset.

Our energy management system forecasts prices and demand, schedules every block and protects the hardware — automatically, and in plain view of the operator.

Operations · Site AV-07DispatchHealthMarketsInterface shown with illustrative data
Day-ahead schedule · MWCharge / discharge
0006121824
Battery blocksSoC 86%
B1
89%
B2
82%
B3
87%
B4
92%
B5
84%
B6
80%
B7
88%
B8
90%
Event log18:00

Let’s build infrastructure

for what’s next.

Tell us about your site, your load or your grid connection. An engineer — not a sales team — will reply within two working days.

Let’s build infrastructure

for what’s next.

Tell us about your site, your load or your grid connection. An engineer — not a sales team — will reply within two working days.

Let’s build infrastructure

for what’s next.

Tell us about your site, your load or your grid connection. An engineer — not a sales team — will reply within two working days.

Create a free website with Framer, the website builder loved by startups, designers and agencies.