Sector
Grid
Technology
Charging + BESS
Capacity
12 MW
Client
Demo transit authority
Delivery
9 months
(01) Challenge
What stood in the way
Electrifying a 140-bus depot would have required a costly grid upgrade with a long lead time.
(02) Solution
What we built
On-site storage charges slowly through the day and delivers high power overnight, so the depot charges every bus on the existing connection.



(03) Outcomes
What the system
delivers.
Illustrative demonstration figures.
€4.1M
Grid upgrade avoided
140
Buses charged nightly
9 months
Concept to operation
(04) System details
Under
the hood.
Key specifications of the delivered system. Illustrative values.
Charging
12 MW peak
Storage
8 MW / 16 MWh
Fleet
140 electric buses
Connection
Existing 11 kV