Grid connection queues: what developers can do now

Practical ways to move forward while waiting for capacity.

Aerial view of an industrial estuary with a substation

Written by

Maren Holt

Chief Executive

LinkedIn

Connection queues in many markets now run for years. For developers that is frustrating, but waiting passively is the most expensive option. There is usually more that can be done while the queue moves.

Use the waiting time

Permits, land rights, equipment framework agreements and network studies all take time on their own. Running them in parallel with the queue means a project is ready to build the moment capacity is confirmed.

A queue position is only valuable if the project behind it is ready to move.

It also pays to talk to the network operator early and often. Small changes to export limits, timing or location can sometimes open an earlier, cheaper connection.

Options worth testing

  • Flexible or non-firm connections that accept occasional curtailment

  • Co-locating storage with existing generation to share a connection

  • Staged capacity that starts smaller and grows as reinforcement lands

  • Storage that provides network services to earn priority or reduce upgrades

No single option fits every site. Testing several early keeps the project moving when the queue does not.

Let’s build infrastructure

for what’s next.

Tell us about your site, your load or your grid connection. An engineer — not a sales team — will reply within two working days.

Let’s build infrastructure

for what’s next.

Tell us about your site, your load or your grid connection. An engineer — not a sales team — will reply within two working days.

Let’s build infrastructure

for what’s next.

Tell us about your site, your load or your grid connection. An engineer — not a sales team — will reply within two working days.

Create a free website with Framer, the website builder loved by startups, designers and agencies.