Connection queues in many markets now run for years. For developers that is frustrating, but waiting passively is the most expensive option. There is usually more that can be done while the queue moves.
Use the waiting time
Permits, land rights, equipment framework agreements and network studies all take time on their own. Running them in parallel with the queue means a project is ready to build the moment capacity is confirmed.
A queue position is only valuable if the project behind it is ready to move.
It also pays to talk to the network operator early and often. Small changes to export limits, timing or location can sometimes open an earlier, cheaper connection.
Options worth testing
Flexible or non-firm connections that accept occasional curtailment
Co-locating storage with existing generation to share a connection
Staged capacity that starts smaller and grows as reinforcement lands
Storage that provides network services to earn priority or reduce upgrades
No single option fits every site. Testing several early keeps the project moving when the queue does not.