(01) Challenge
What stood in the way
A new campus in a constrained grid region needed 60 MW of critical load with tight uptime targets and high demand charges.
(02) Solution
What we built
A 2N utility interconnection with a 4-hour battery that rides through outages and cuts summer peaks, integrated with UPS and standby generation in one control scheme.



(03) Outcomes
What the system
delivers.
Illustrative demonstration figures.
−18%
Peak demand charges
< 10 ms
Transfer to storage
Phased
Four-hall energisation
(04) System details
Under
the hood.
Key specifications of the delivered system. Illustrative values.
Critical load
60 MW
Redundancy
2N
Storage
60 MW / 240 MWh
Utility
Dual 230 kV feeds